Return to Newsletter
 

Bookmark and Share
lllllimage

Editor’s Update:
Summertime and LTS Heavy Lifting

Summer “vacation” for many in LTS, and some other university departments, is the crucial window for upgrading facilities with minimal disruption to the academic program.

We don’t run bulldozers but a lot of “heavy lifting” takes place nonetheless.

Summer 2008 saw:

  • 210 new public site computers were installed, including all of the iMacs in the Digital Media Studio, systems in the RBC, the EWFM 8B Training Lab, the Media Center, and Coppee.

  • Upgrades to AV technology in 20 classrooms, with new instructor’s podium and PC, a computer projector, DVD player, and screen. Upgrades took place in RBC, Maginnes, Chandler and several other locations across campus.

  • Installation of wireless connectivity in Christmas Saucon and parts of Stabler Arena and testing of a new, coming wireless standard, 802.11N.

  • Installation of 165 new telephones for the classroom alert system... see article

  • Installation of the new Special Collections Exhibit: How to Become an Engineer: Toys, Tools, and Technology... see article

  • Three new high end computing upgrades: a new compute server, an 18-node Linux login farm, and 20 Lynix workstations... see article

  • Subscription to ICPSR, the world's largest archive of digital social science data with Professor Ziad Munson as Lehigh’s ICPSR representative.

As you can see from the list above, we've been very busy this summer. Be sure to read the articles describing some of these accomplishments in this edition.

--Susan A. Cady
  LTS Director for Administrative and Planning Services

Article posted September 12, 2008


 

Return to Newsletter

 

Lehigh University


© 2006 Lehigh University - Library and Technology Services
8A E. Packer Avenue, Bethlehem, PA 18015
Tel. 610-758-3025